Skip to content
⚓ Coast Guard Sub-Station Santa Fe: island hopping and small boats (up to 15 GT) suspended on listed routes · since 07:20, 26 Nov 2026 (Manila) → details
bantayan.org

Island life · power outages

Power outages on Bantayan Island – two years of BANELCO notices by barangay.

Short answer: From November 2024 to November 2026, BANELCO posted 96 power interruptions on Bantayan Island. 56 were planned work, announced a median of 3 days ahead, with a typical announced window of 3.5 hours. 10 affected the whole island. The count is a lower limit: short local faults are often not posted.

BANELCO notices in 2 years
96
typical announced window
3.5 hours
typical notice ahead
3 days
Published 1 confirmed by an official source
Illustration: an island village at dusk during a power interruption, warm lamp light in a few windows, concrete power poles and cables against an orange sky, a family sitting outside with a rechargeable lamp
AI illustration

15 November 2024 – 27 November 2026

Two years in numbers

In two years BANELCO posted 96 power interruptions. A typical planned one is announced 3 days ahead and for 3.5 hours. Is anything planned this week?

  • 96interruptions BANELCO posted
  • 86different days in the notices
  • 3 daystypical notice before planned work
  • 3.5 htypical planned window, as announced
  • 10affected the whole island
  • 56 planned (58%) – announced days ahead
  • 16 short notice (17%) – urgent repair, announced the same day or the day before
  • 24 unplanned (25%) – faults, storms, animals on the line

This is a lower limit: we can only count what BANELCO posted. Short faults on one street are often not posted. What the numbers can and cannot tell you.

Day by day

Calendar: every day with an interruption

One row is one month, one square is one day. The busiest month was June 2025 with 10 interruptions. 1 of 25 months has no notice at all in our data.

  • planned
  • short notice
  • unplanned
  • whole island

The number on the right is the month's total. Empty rows are gaps in the notices, not proof of steady power. The last square is a planned interruption BANELCO had announced by 25 November 2026.

Show the numbers per month
MonthPlannedShort noticeUnplanned
November 2024201
December 2024001
January 2025211
February 2025313
March 2025121
April 2025112
May 2025530
June 2025721
July 2025502
August 2025400
September 2025305
October 2025010
November 2025013
December 2025200
January 2026200
February 2026110
March 2026600
May 2026001
June 2026011
July 2026310
August 2026102
September 2026210
October 2026100
November 2026500

Where

By barangay

48 barangays are named in the notices. Half of them were named 10 times or fewer in two years; the most was Poblacion (Santa Fe) with 18. The big number is the count, the bar shows the mix, and the small line the hours we know.

Staying at the beach in Santa Fe? Sugar Beach is in Pooc (our local guide), Kota Beach in Poblacion (OpenStreetMap; the border with Pooc runs close by).

Find your barangay: Santa Fe (9) · Bantayan (25) · Madridejos (14)

The small number in each tile is the known hours without power from BANELCO's notices; * means the length of at least one interruption is not known, so the real hours are higher. Not in these tiles: the 10 island-wide interruptions and 18 notices where we could not read the area. A notice that names part of a barangay counts for the whole barangay.

  • planned
  • short notice
  • unplanned

Santa Fe 9 barangays · 25 interruptions that name the town

  • Poblacion1877 h*
  • Hilantagaan1268 h*
  • Ocoy1263 h*
  • Pooc1249 h*
  • Talisay1266 h*
  • Maricaban1040 h*
  • Balidbid833 h*
  • Hagdan833 h*
  • Langub833 h*

Bantayan 25 barangays · 40 interruptions that name the town

  • Bantigue1545 h*
  • Kangkaibe1530 h*
  • Kabangbang1340 h*
  • Atop-atop1225 h*
  • Tamiao1225 h*
  • Baod1125 h
  • Kampingganon1125 h
  • Guiwanon1021 h
  • Kabac1022 h
  • Oboob1040 h*
  • Patao1022 h
  • Putian1021 h
  • Mojon833 h*
  • Doong726 h
  • Lipayran726 h
  • Luyongbaybay726 h
  • Botigues518 h
  • Sulangan518 h
  • Sungko414 h
  • Ticad414 h
  • Baigad34 h*
  • Sillon34 h*
  • Suba38 h
  • Binaobao24 h
  • Hilotongan17 h

Madridejos 14 barangays · 22 interruptions that name the town

  • Kaongkod1542 h*
  • Malbago1339 h
  • San Agustin1335 h*
  • Pili1233 h
  • Bunakan1129 h
  • Kangwayan1130 h
  • Maalat1129 h
  • Mancilang1132 h
  • Poblacion1137 h
  • Tabagak1129 h
  • Tarong1129 h
  • Kodia1026 h
  • Talangnan1026 h
  • Tugas1026 h

* the length of at least one interruption is not known, so the real hours are higher. Not in the tiles: the 10 island-wide interruptions (27.3 known hours, 6 with unknown length), which hit almost every barangay, 18 cases where we know the day but not the exact area, and one day with many separate faults across the island (22 Sep 2025). "Part of a barangay" counts for the whole barangay.

Show the numbers per barangay
BarangayTownPlannedShort noticeUnplannedKnown hoursLast
PoblacionSanta Fe112577*25 Nov 2026
HilantagaanSanta Fe80468*25 Nov 2026
OcoySanta Fe70563*25 Nov 2026
PoocSanta Fe71449*28 Oct 2026
TalisaySanta Fe80466*25 Nov 2026
MaricabanSanta Fe60440*26 Aug 2026
BalidbidSanta Fe40433*26 Aug 2026
HagdanSanta Fe40433*26 Aug 2026
LangubSanta Fe40433*26 Aug 2026
BantigueBantayan73545*4 Sep 2026
KangkaibeBantayan72630*27 Nov 2026
KabangbangBantayan63440*4 Sep 2026
Atop-atopBantayan53425*4 Sep 2026
TamiaoBantayan53425*4 Sep 2026
BaodBantayan524254 Sep 2026
KampingganonBantayan434254 Sep 2026
GuiwanonBantayan424214 Sep 2026
KabacBantayan424224 Sep 2026
OboobBantayan60440*26 Aug 2026
PataoBantayan4242218 Nov 2026
PutianBantayan424214 Sep 2026
MojonBantayan40433*26 Aug 2026
DoongBantayan6012614 Nov 2026
LipayranBantayan6012614 Nov 2026
LuyongbaybayBantayan6012614 Nov 2026
BotiguesBantayan4011826 Aug 2026
SulanganBantayan4011826 Aug 2026
SungkoBantayan3011426 Aug 2026
TicadBantayan3011426 Aug 2026
BaigadBantayan1024*18 Jul 2026
SillonBantayan1024*18 Jul 2026
SubaBantayan201818 Jul 2026
BinaobaoBantayan101418 Jul 2026
HilotonganBantayan100726 Aug 2026
KaongkodMadridejos82542*4 Sep 2026
MalbagoMadridejos724394 Sep 2026
San AgustinMadridejos62535*4 Sep 2026
PiliMadridejos624334 Sep 2026
BunakanMadridejos524294 Sep 2026
KangwayanMadridejos524304 Sep 2026
MaalatMadridejos524294 Sep 2026
MancilangMadridejos524324 Sep 2026
PoblacionMadridejos524374 Sep 2026
TabagakMadridejos524294 Sep 2026
TarongMadridejos524294 Sep 2026
KodiaMadridejos424264 Sep 2026
TalangnanMadridejos424264 Sep 2026
TugasMadridejos424264 Sep 2026

When

Time of day and weekday

Planned work mostly starts at 8 AM (27 planned cases) or 5 AM (16). The columns below show all three kinds together. 84 of the 96 posted interruptions were on a Tuesday to Friday, only 8 on a weekend.

Start hour (25 notices gave no start time)

Weekday

  • planned
  • short notice
  • unplanned

How long

How long it lasts

  • 3.5 hplanned, typical announced window
    48 cases with a known end
  • 1.5 hshort notice, typical
    7 cases
  • 55 minunplanned, typical
    10 cases

"Typical" is the median: half of the cases were shorter, half longer. Hours are the announced hours, or the time until BANELCO posted that power was back. 31 of 96 notices gave no end time; many of them are faults that BANELCO reported while the crew was still working. The longest case with a known length: about 13.5 hours on 9 February 2025, island-wide (power plant down; BANELCO post).

Longer, but without a number of hours: Typhoon Tino (Kalmaegi): the power plant was switched off for safety and BANELCO brought power back area by area over several days (4 November 2025; BANELCO posted updates until 12 November 2025). BANELCO post. This case is not in the bars above.

Why

Why the power was off

49 of 96 interruptions were upkeep and upgrades: new and moved poles, trees cut back from the lines, stronger lines. That is work that prevents faults later.

  • planned
  • short notice
  • unplanned

Reasons are the ones BANELCO gave in its notices, grouped by us. "Power plant" means the island's power plant was down or switched off; that is not a fault on BANELCO's lines.

The network

Feeder lines

A feeder is a main line from the switchyard. When a feeder is off, every barangay on it is dark. 73 of 96 notices name no feeder, so these counts are only the cases where BANELCO named the line.

  • Feeder 213 cases · 40.4 known hours7 planned, 2 short notice, 4 unplannedAll of Madridejos; in the town of Bantayan: Bantigue (Campo), Guiwanon, Kabangbang, Kampingganon, Baod, Patao, Putian, Kabac, Atop-atop, Tamiao, part of Kangkaibe.
  • Feeder 39 cases · 52.9 known hours5 planned, 4 unplannedAll of Santa Fe except Kinatarcan; in the town of Bantayan: Oboob, Mojon.
  • Feeder 41 case · 0.7 known hours1 unplannedBANELCO has not listed the barangays on this line in the notices we read.
  • planned
  • short notice
  • unplanned

The barangay lists are the ones BANELCO gave in its own posts for each feeder. Where it says "part of", only some sitios of that barangay are on the line.

Sources

Every case with its source

Each line links to the BANELCO notice it comes from. Times are Philippine time.

2026 · 29 interruptions
  • 27 Nov 2026 (announced), 08:00–12:00 · Kangkaibe (Bantayan) · planned · rotten pole replacement · BANELCO Facebook page
  • 25 Nov 2026, 05:00–17:00 · Hilantagaan (Santa Fe), Ocoy (Santa Fe), Poblacion (Santa Fe), Talisay (Santa Fe) · planned · Feeder 3 line upgrade · BANELCO Facebook page
  • 18 Nov 2026, 08:00–12:00 · Patao (Bantayan) · planned · reason not given · BANELCO Facebook page
  • 14 Nov 2026, 08:00–12:00 · Doong (Bantayan), Lipayran (Bantayan), Luyongbaybay (Bantayan) · planned · tree clearing along the line · BANELCO Facebook page
  • 12 Nov 2026, 05:00–12:00 · Hilantagaan (Santa Fe), Ocoy (Santa Fe), Talisay (Santa Fe) · planned · new pole and moving the main line · BANELCO Facebook page
  • 28 Oct 2026, 05:00–16:00 · Hilantagaan (Santa Fe), Ocoy (Santa Fe), Poblacion (Santa Fe), Pooc (Santa Fe), Talisay (Santa Fe) · planned · Feeder 3 line upgrade · BANELCO Facebook page
  • 18 Sep 2026, 13:30–15:00 · Poblacion (Santa Fe), Pooc (Santa Fe) · short-notice repair · secondary line restructuring · BANELCO Facebook page
  • 8 Sep 2026, 09:00–12:00 · Poblacion (Santa Fe) · planned · line clearing · BANELCO Facebook page
  • 4 Sep 2026, 05:00–10:00 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · planned · Feeder 2 backbone upgrade after frequent faults · BANELCO Facebook page
  • 29 Aug 2026, 11:25–11:54 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · unplanned · bat on the line · BANELCO Facebook page
  • 28 Aug 2026, time not given · area not read · unplanned · fallen tree on the main line · BANELCO Facebook page
  • 26 Aug 2026, 05:00–12:00 · 19 barangays: Balidbid (Santa Fe), Botigues (Bantayan), Doong (Bantayan), Hagdan (Santa Fe), Hilantagaan (Santa Fe) and more · planned · Feeder 3 line upgrade · BANELCO Facebook page
  • 20 Jul 2026, 09:30–15:00 · Hilantagaan (Santa Fe) · planned · primary line relocation · BANELCO Facebook page
  • 18 Jul 2026, 05:00–08:00 · 22 barangays: Baigad (Bantayan), Balidbid (Santa Fe), Binaobao (Bantayan), Botigues (Bantayan), Doong (Bantayan) and more · planned · Feeder 2 re-routing and upgrade · BANELCO Facebook page
  • 18 Jul 2026, 05:00–13:00 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · planned · Feeder 2 re-routing and upgrade · BANELCO Facebook page
  • 1 Jul 2026, 16:00–16:54 · whole island · short-notice repair · hotspot repair · BANELCO Facebook page
  • 25 Jun 2026, from 10:00 · area not read · short-notice repair · equipment replacement · BANELCO Facebook page
  • 11 Jun 2026, time not given · area not read · unplanned · storm · BANELCO Facebook page
  • 22 May 2026, from 11:09 · whole island · unplanned · cause not known at the time · BANELCO Facebook page
  • 31 Mar 2026, 13:00–17:00 · Atop-atop (Bantayan), Tamiao (Bantayan) · planned · pole relocation (consumer request) · BANELCO Facebook page
  • 26 Mar 2026, time not given · area not read · planned · reason not given · BANELCO Facebook page
  • 18 Mar 2026, 05:00–08:00 · 23 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · planned · hotspot correction and line clearing (Feeder 2) · BANELCO Facebook page
  • 18 Mar 2026, 05:00–12:00 · area not read · planned · reason not given · BANELCO Facebook page
  • 12 Mar 2026, time not given · area not read · planned · reason not given · BANELCO Facebook page
  • 6 Mar 2026, 09:00–12:00 · Bunakan (Madridejos), Maalat (Madridejos), Tabagak (Madridejos), Tarong (Madridejos) · planned · line clearing · BANELCO Facebook page
  • 13 Feb 2026, 08:30–12:00 · Kangwayan (Madridejos) · planned · additional pole and fuse cutout · BANELCO Facebook page
  • 12 Feb 2026, 08:30–12:00 · Kampingganon (Bantayan) · short-notice repair · emergency load balancing, new transformer · BANELCO Facebook page
  • 29 Jan 2026, until 14:02 · whole island · planned · reason not given · BANELCO Facebook page
  • 23 Jan 2026, 08:30–12:00 · Kaongkod (Madridejos), Malbago (Madridejos) · planned · pole relocation (consumer request) · BANELCO Facebook page
2025 · 63 interruptions
  • 17 Dec 2025, 08:30–12:00 · San Agustin (Madridejos) · planned · pole relocation · BANELCO Facebook page
  • 12 Dec 2025, 08:00–12:00 · Botigues (Bantayan), Doong (Bantayan), Lipayran (Bantayan), Luyongbaybay (Bantayan), Sulangan (Bantayan) · planned · pole restructuring, fuse cutouts for submarine cable · BANELCO Facebook page
  • 27 Nov 2025, 06:45–07:41 · whole island · unplanned · line fault · BANELCO Facebook page
  • 26 Nov 2025, 13:30–16:30 · Poblacion (Santa Fe) · short-notice repair · line clearing on LGU request · BANELCO Facebook page
  • 26 Nov 2025, time not given · area not read · unplanned · reason not given · BANELCO Facebook page
  • 4 Nov 2025, from 05:15 · whole island · unplanned · Typhoon Tino (Kalmaegi): power plant switched off for safety · BANELCO Facebook page
  • 15 Oct 2025, 22:30–22:55 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · short-notice repair · hotspot correction at sectionalizer · BANELCO Facebook page
  • 26 Sep 2025, time not given · Baigad (Bantayan), Kangkaibe (Bantayan), Sillon (Bantayan) · unplanned · storm damage, clearing ongoing · BANELCO Facebook page
  • 24 Sep 2025, time not given · Pooc (Santa Fe) · planned · line clearing · BANELCO Facebook page
  • 22 Sep 2025, time not given · many places across the island · unplanned · strong winds, trees on lines · BANELCO Facebook page
  • 19 Sep 2025, 08:30–12:00 · Kangkaibe (Bantayan) · planned · pole relocation, line clearing · BANELCO Facebook page
  • 19 Sep 2025, from 06:30 · Ocoy (Santa Fe), Poblacion (Santa Fe) · unplanned · cause not known at the time · BANELCO Facebook page
  • 17 Sep 2025, 17:21–18:26 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · unplanned · reason not given · BANELCO Facebook page
  • 17 Sep 2025, 08:30–12:00 · Kaongkod (Madridejos), Malbago (Madridejos) · planned · pole restructuring (consumer request) · BANELCO Facebook page
  • 13 Sep 2025, 03:06–04:00 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · unplanned · damaged lightning arrester · BANELCO Facebook page
  • 20 Aug 2025, 09:00–12:00 · Poblacion (Santa Fe) · planned · reason not given · BANELCO Facebook page
  • 15 Aug 2025, 08:30–12:00 · Malbago (Madridejos), Mancilang (Madridejos) · planned · new pole, tree clearing · BANELCO Facebook page
  • 14 Aug 2025, 08:30–12:00 · Kaongkod (Madridejos), Pili (Madridejos), San Agustin (Madridejos) · planned · steel pole replacement · BANELCO Facebook page
  • 1 Aug 2025, 08:30–12:00 · Poblacion (Santa Fe) · planned · pole relocation (consumer request) · BANELCO Facebook page
  • 31 Jul 2025, 08:30–12:00 · Oboob (Bantayan) · planned · pole relocation (consumer request) · BANELCO Facebook page
  • 30 Jul 2025, 08:30–17:00 · Poblacion (Madridejos) · planned · pole relocation (consumer request) · BANELCO Facebook page
  • 22 Jul 2025, time not given · area not read · planned · reason not given · BANELCO Facebook page
  • 20 Jul 2025, from 06:15 · whole island · unplanned · birds · BANELCO Facebook page
  • 18 Jul 2025, time not given · area not read · planned · pole relocation, longer because a bat hit the crossarm · BANELCO Facebook page
  • 15 Jul 2025, 04:14–04:55 · 13 barangays: Baigad (Bantayan), Bantigue (Bantayan), Binaobao (Bantayan), Botigues (Bantayan), Doong (Bantayan) and more · unplanned · transient fault · BANELCO Facebook page
  • 11 Jul 2025, 08:30–12:00 · Pili (Madridejos), Pooc (Santa Fe) · planned · pole relocation (road widening), line clearing · BANELCO Facebook page
  • 19 Jun 2025, 05:00–07:00 · 11 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Guiwanon (Bantayan), Kabac (Bantayan) and more · planned · hotspot correction at switchyard (Feeder 2) · BANELCO Facebook page
  • 19 Jun 2025, 05:00–12:00 · 9 barangays: Bunakan (Madridejos), Kangwayan (Madridejos), Kodia (Madridejos), Maalat (Madridejos), Pili (Madridejos) and more · planned · hotspot correction at switchyard (Feeder 2) · BANELCO Facebook page
  • 19 Jun 2025, 05:00–14:00 · Kaongkod (Madridejos), Malbago (Madridejos), Mancilang (Madridejos), Poblacion (Madridejos), San Agustin (Madridejos) · planned · hotspot correction at switchyard (Feeder 2) · BANELCO Facebook page
  • 13 Jun 2025, until 22:28 · whole island · unplanned · power plant side, cause not known at the time · BANELCO Facebook page
  • 11 Jun 2025, 08:30–12:00 · Botigues (Bantayan), Doong (Bantayan), Lipayran (Bantayan), Luyongbaybay (Bantayan), Sulangan (Bantayan) · planned · line clearing · BANELCO Facebook page
  • 10 Jun 2025, time not given · Atop-atop (Bantayan), Tamiao (Bantayan) · short-notice repair · bamboo and tree clearing · BANELCO Facebook page
  • 5 Jun 2025, 08:30–12:00 · Maricaban (Santa Fe), Oboob (Bantayan) · planned · line clearing · BANELCO Facebook page
  • 4 Jun 2025, 08:30–12:00 · Doong (Bantayan), Lipayran (Bantayan), Luyongbaybay (Bantayan), Talisay (Santa Fe) · planned · line clearing · BANELCO Facebook page
  • 3 Jun 2025, 08:30–12:00 · Bantigue (Bantayan), Ticad (Bantayan) · planned · line clearing · BANELCO Facebook page
  • 3 Jun 2025, time not given · area not read · short-notice repair · recurring faults · BANELCO Facebook page
  • 30 May 2025, 08:30–12:00 · Baod (Bantayan) · planned · pole relocation (road widening) · BANELCO Facebook page
  • 29 May 2025, 08:30–12:00 · Kaongkod (Madridejos) · planned · pole relocation (road widening) · BANELCO Facebook page
  • 27 May 2025, 08:30–12:00 · Poblacion (Santa Fe) · planned · pole relocation · BANELCO Facebook page
  • 26 May 2025, 13:30–17:00 · Maricaban (Santa Fe) · planned · pole relocation · BANELCO Facebook page
  • 22 May 2025, 05:00–13:22 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · planned · Feeder 3 line upgrade · BANELCO Facebook page
  • 9 May 2025, time not given · area not read · short-notice repair · line clearing before the 2025 elections · BANELCO Facebook page
  • 8 May 2025, time not given · area not read · short-notice repair · line clearing before the 2025 elections · BANELCO Facebook page
  • 6 May 2025, time not given · area not read · short-notice repair · reason not given · BANELCO Facebook page
  • 16 Apr 2025, 05:30–06:00 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · short-notice repair · hotspot correction at sectionalizer · BANELCO Facebook page
  • 8 Apr 2025, time not given · area not read · planned · reason not given · BANELCO Facebook page
  • 4 Apr 2025, time not given · Kaongkod (Madridejos), San Agustin (Madridejos) · unplanned · reason not given · BANELCO Facebook page
  • 3 Apr 2025, until 08:19 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · unplanned · bird · BANELCO Facebook page
  • 27 Mar 2025, 05:00–16:37 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · planned · Feeder 3 line upgrade · BANELCO Facebook page
  • 12 Mar 2025, time not given · area not read · unplanned · cut line · BANELCO Facebook page
  • 11 Mar 2025, time not given · area not read · short-notice repair · reason not given · BANELCO Facebook page
  • 6 Mar 2025, time not given · area not read · short-notice repair · reason not given · BANELCO Facebook page
  • 28 Feb 2025, from 08:00 · Bantigue (Bantayan), Kabangbang (Bantayan), Kangkaibe (Bantayan) · planned · reason not given · BANELCO Facebook page
  • 15 Feb 2025, 06:00–16:00 · Bantigue (Bantayan), Kabangbang (Bantayan) · short-notice repair · line upgrade · BANELCO Facebook page
  • 13 Feb 2025, 08:00–12:00 · Kabac (Bantayan) · planned · pole relocation · BANELCO Facebook page
  • 11 Feb 2025, 05:00–14:00 · Bantigue (Bantayan), Kabangbang (Bantayan) · planned · line conversion and line clearing · BANELCO Facebook page
  • 11 Feb 2025, 00:28–00:53 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · unplanned · line fault · BANELCO Facebook page
  • 10 Feb 2025, 14:21–15:15 · 11 barangays: Balidbid (Santa Fe), Hagdan (Santa Fe), Hilantagaan (Santa Fe), Langub (Santa Fe), Maricaban (Santa Fe) and more · unplanned · jumper cutout came loose · BANELCO Facebook page
  • 9 Feb 2025, 00:05–13:33 · whole island · unplanned · power plant down · BANELCO Facebook page
  • 28 Jan 2025, 05:00–17:00 · whole island · planned · annual maintenance of the power plant (INPC) · BANELCO Facebook page
  • 17 Jan 2025, 08:00–12:00 · Suba (Bantayan) · planned · pole relocation · BANELCO Facebook page
  • 16 Jan 2025, 13:42–14:18 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · unplanned · line fault · BANELCO Facebook page
  • 14 Jan 2025, time not given · area not read · short-notice repair · damaged equipment replacement · BANELCO Facebook page
2024 · 4 interruptions
  • 3 Dec 2024, until 08:00 · whole island · unplanned · reason not given · BANELCO Facebook page
  • 22 Nov 2024, 08:30–12:00 · Sungko (Bantayan) · planned · line clearing · BANELCO Facebook page
  • 15 Nov 2024, 15:00–16:00 · 25 barangays: Atop-atop (Bantayan), Bantigue (Bantayan), Baod (Bantayan), Bunakan (Madridejos), Guiwanon (Bantayan) and more · unplanned · damaged fuse cutout · BANELCO Facebook page
  • 15 Nov 2024, 08:30–12:00 · Poblacion (Santa Fe) · planned · line clearing · BANELCO Facebook page

Good to know

What these numbers can and cannot tell you

  • Only what BANELCO posted. We read the BANELCO Facebook page back to November 2024. Short faults on one street are often not posted at all, so the real number of interruptions is higher.
  • Announced is not the same as happened. Hours are the announced hours, or the restoration time when BANELCO posted one. Interruptions that BANELCO cancelled are not counted (19 rows in our data).
  • Some notices were only partly readable. In 18 cases we know the day but not the exact area. They count in the calendar, not in the barangays.
  • One notice can hold several cases. When BANELCO gives different time slots for different areas, each slot counts as one case.
  • More notices do not mean worse service. A cooperative that announces its work shows up more often in a count like this than one that does not.
  • No names, no comments. We count notices of the cooperative. We do not collect posts, names or profiles of residents.

Data as of 25 November 2026.

What this means for your stay

Illustration: What this means for your stay – Power outages on Bantayan Island – two years of BANELCO notices by barangay
AI illustration
  • Short holiday: you may not notice anything. Planned work is posted ahead and mostly starts in the morning on a weekday – see “Time and weekday” above.
  • Check before a work day: if you need power for a call or a deadline, look at the list of announced interruptions first. It shows what BANELCO has announced for the coming days.
  • Keep things charged: a full phone, a power bank and a rechargeable lamp cover a typical planned interruption.
  • After a typhoon: power can come back area by area over several days, as in November 2025 (see “How long” above). Plan for that in typhoon season.
  • Staying for months or working online: see whether a generator, a power station or Starlink is worth it. 

How BANELCO handles interruptions

Illustration: How BANELCO handles interruptions – Power outages on Bantayan Island – two years of BANELCO notices by barangay
AI illustration

BANELCO is the island’s electric cooperative. These numbers show how it informs its members; they are not a grade.

  • It announces planned work: of the planned interruptions with a known posting date, 50 of 55 were announced at least two days ahead. The median is 3 days.
  • The notices are specific: they name the barangays and the hours, so you can plan around them.
  • Most planned work is upkeep: 49 of the 96 notices are for replacing or moving poles, clearing trees from the lines and extending the grid. That is work that prevents later faults.
  • It posts faults too: 24 notices are about unplanned interruptions, often with the reason.
  • The crew is on call: BANELCO says its line crew is on standby 24/7 for power interruptions and electrical emergencies.
  • Not every cut starts on the lines: some island-wide interruptions started at the island’s power plant or with a storm. 

How we count

  • Source: only the notices BANELCO posts on its Facebook page. Every case in the list above links to its post.
  • Three kinds: planned means announced ahead. Short notice means an emergency repair or work announced on the same day. Unplanned means a fault that BANELCO reported.
  • One time window, one case: a case is one time window from one notice. Several barangays in the same window count as one case. A notice with several time windows counts once per window.
  • Barangays: if a notice names a barangay, the whole barangay counts, even when only one sitio or street was off. Island-wide interruptions are not in the barangay numbers.
  • Length: for planned work we use the announced hours. The real interruption can be shorter or longer. 31 notices give no end time.
  • A lower limit: short local faults are often not posted, so the real number is higher.
  • Data as of: 25 November 2026. 

FAQ

How often does the power go out on Bantayan Island?

BANELCO posted 96 interruptions from November 2024 to November 2026: 56 planned, 16 at short notice and 24 unplanned. The notices cover 86 different days. This is a lower limit, because short local faults are often not posted.

How long does a power interruption on Bantayan last?

A typical planned interruption is announced for 3.5 hours (48 planned cases with known hours). Unplanned interruptions with a known length were shorter, typically about 55 minutes (10 cases). The longest with a known length was about 13.5 hours on 9 February 2025. After a typhoon in November 2025, power came back over several days.

Which barangay has the most power interruptions?

In our count, Poblacion in Santa Fe (18) was named most often. The typical barangay was named 10 times in two years. Island-wide interruptions are not in these numbers, and for 18 notices we could not read the area.

Does BANELCO announce power interruptions?

Yes. It posts planned work on its Facebook page, typically 3 days ahead, with the barangays and the hours. We list the announced interruptions on our electricity page.

Is the power on Bantayan reliable enough to work online?

For most days, yes, if you plan around the announced interruptions and keep a charged laptop. If your work cannot wait, read generator, power station or Starlink.

Plan your trip.

Next ferry times